Hi,
I don't know if it's an Eclipse problem or a WOLips problem: Every once
in a while, Eclipse's refresh workspace seems to hang. It sits there
stating something like "Resources to refresh: 69", but the number never
ever decreases. Also it consumes 100% CPU while doing so, which is
probably because of that fancy progress-bar in the lower-right corner,
which seems to make the WindowServer very busy on the Mac. Restarting
Eclipse helps for a while, as does clicking "Cancel", which decreases
the amount of resources Eclipse thinks it needs to refresh by one. So
in the above example, you have to click Cancel 69 times, before the
problem goes away.
This is with Eclipse 3.1M5a and WOLips 1.1.0.102 and the WOComponent
Renamer plugin someone posted here recently (Not the one built into
newer versions of WOLips), and a few other plugins. "Refresh workspace
automatically" is on.
Any Idea? This is driving me nuts!
Thanks,
Timo
This archive was generated by hypermail 2.0.0 : Thu Mar 10 2005 - 07:07:24 EST